Sreenith Sathian wrote:
I need to do this while posting happens in VF01 ,
Yeah but these are CO-PA fields. Isn't there some "derivation" or other CO-PA stuff available for this? Have you asked a functional consultant?
Sreenith Sathian wrote:
I need to do this while posting happens in VF01 ,
Yeah but these are CO-PA fields. Isn't there some "derivation" or other CO-PA stuff available for this? Have you asked a functional consultant?
The settings for WPT 3040 is the same. But WT is created when stock type is Q. Why?
BR,
Catharine
Hi Deepika,
Worksetmap iView and ServiceMap Iview do not support 3x3,
for your questions regarding levelsup and pathlist.
Your link tells you exactly what you need.
if your workset is a parent of your workset map iView then levelsup=1 is good for you.
If it is a grandparent (parent of a parent) you need levelsup=2.. and so on.
if the path for the workset is a different path (not a parent) you need to specify the path by using ID's
from the Role each container (folder for example) should be specificed with semicolon to separate them.
Folder1ID;Folder2ID etc.
BR,
Saar
SAP recommends that customers make ECC the master system of record for customer master data and then feed other systems like SAP C4C with the information via available integration.
Thank you.
Hi Sel,
Thanks for sharing. If you can paste here some part of the dev_w0 file that shows this information that would help others that faced the same situation
Thank you and best regards,
Luis Darui
Hi Apu,
After installing the certificate no need to restart the whole PI server to work the new certificate you just need to restart the communication channel after importing the new certificate.
1829329 - Messages fail in PI SOAP Receiver Adapter after updating the Server Certificate
For performance reasons the SOAP adapter caches the server certificate on channel start up. Therefore when the Keystore is updated with the new certificate, the old certificate is still maintained within the cache and therefore used by the channel.
Regards,
Praveen.
Hi Anderson,
Your case is different from mine.
You can check this note and apply relative steps.
1975402 - Compatibility Issues in Internet Explorer browser for Transaction Launcher
Stanley
Yes, I knew it was an example. I had substituted my own service and HANA schema/ tables.
I have fixed my problem now. I was not using the correct service field (I needed just the service name, not to enter properties of the service and put in ODCB DSN).
Thanks for your assistance.
You are not checking sy-subrc after each SELECT statement. You can put a break-point before the first SELECT and see the value of sy-subrc after each call. In any case, you should add some logic to handle non-zero return codes.
Rob
Hello,
I've ran into issue when installing SP7. All the VUs upgraded successfully but reporting throws this error every time:
Create software instance [Standard Reports] to virtual unit [VU_REPORTING]: Failed to run method 'postinstal' in 'C:\SAP\BCM\7.0.7.0\Standard Reports\method': Method returned an error: Exit code=-1=0xFFFFFFFF
I'm upgrading from 7.0.6.100 and I've read several topics here describing the problem, but so far none of the suggestions provided were of ony help.
I'm at my wits end here, any idea what can be causing this?
Regards,
Robert
Hi,
Are you saying that when you debug it steps right over the statement
MOVE xsetname+0(4) TO xsetn.
without executing it?
Sorry, I can't see any explanation for that, other than the code you are viewing in the debugger is not the same that is executing. Activation should fix that!
(Checking sy-subrc should certainly also be done, but it won't affect this behaviour)
cheers
Paul
Um, you forgot to mention the name of the function module.
Hi Tim,
Yes, this possible but it's a bit hard to explain in a few words.
Firstly, you need to follow the Identity Services Configuration Guide, see link.
SAP NetWeaver Identity Management Identity Services - Configuration Guide
Secondly,
I hope you will find this information useful.
Best Regards,
Ridouan Taibi
Hello Dawood,
Thanks again, I will try to do the integration and tests to see if it works .
Thank you by the document.
Regards,
Rodrigo
Hi,
I am displaying an adobe from using the data in the driver program. Assuming I have 10 records each with a different invoice number, I need to display 10 PDFs (one for each invoice number). How do I achieve this? Currently,the data is fed to the Function module FP_FUNCTION_MODULE_NAME and it displays a single PDF with 10 pages. Instead, I am looking for an option to print 10 PDFs. Appreciate help on this.
Thanks,
Pavan
hi exerts,
Our expected events are generated, but do not have a planned date/time. In the expected event profile, I have seen a possibility to add a function that sets the expected date. We need to set the expected event date/time for loading and unloading events. We would like to read it from the related stage. We would like to use the requested start date/time or better the Planned loading date/time (for load_end) and the Planned unload date/time for UNLOAD_END.
I have created a new new multi-task activity and assigned the standard UPDATE_EE_DATETIME to it. Then, I have assigned the Z-mutli-taks activity to the exp event profile. But, when I cancel the FU, the debugger does not stop in method ACT_UPDATE_EE_DATETIME. Could you give me a hint what my error is?
Also, I have seen expected event date/time being set in previous versions without any enhancement. Is this a new functionality with 9.4? Is there a standard way to set the expected event date/time. If not, what would be the smartest way to set the expected date/time?
My idea would be to get to the doc id from the EH_GUID using table /SAPTRX/EH_HDR
and read the related stop. To link the correct stop, I would read the outbound stop for the load_end event with the same location and the inbound stop for the unload_end event. Has someone done this before. What would be your hints?
Thanks so much. I appreciate the support received.
Petra
Search for a domain with a conversion exit that outputs it in the format you want. If you cannot find one, you could easily create one.
Rob
Hi All,
We have a requirement to connect our SAP system with ARIBA network using PI. We have installed the ARIBA PI adapter.
We want to configure sender communication channel where ARIBA can push the messages. PI should send the response in cXML format.
We noticed that the sender communication channel configured using ARIBA adapter always pulls the messages. Looks like this adapter cannot be used ARIBA to push the messages.
We are not sure whether we have installed the correct adapter or there is something need to be done to make it available for pushing messages.
Could somebody please help me. If you need more information please let me know
Shantha