Re: Transfer Work Order for Assignment Type : Header Level Work Center

$
0
0

Hi Gokhan,

 

Please try to apply SAP note 2141223 to see whether the issue can be solved or not.

2141223 - Transfer Work order feature should support multiple personnel number assignment scenario for assignment tyoe '1'

 

Best Regards,

Charlie

SAP Product Support


Re: ICO Scenario - MONI Error

$
0
0

Hi Jeevitha,

 

Test configuration in Integration Directory does not work for ICO configuration because Test configuration executes in ABAP stack and ICO configuration is saved and executed in only java stack hence you are getting "No receiver could be determined".

 

Regards,

Praveen.

Re: External Storage for HANA Appliance Scale-up

$
0
0

Hi Raheel,

 

External Storage is supported by SAP for HANA Database's

The below link provides a list of SAP Certified external storage systems supported

SAP's recommendation is to use a dedicated storage setup for the PRODUCTION systems and the shared Storage can be used for the NON PRODUCTION landscapes

Such a storage setup is considered a Tailored Datacenter Integration(TDI)

 

http://global.sap.com/community/ebook/2014-09-02-hana-hardware/enEN/enterprise-storage.html

 

Hope this helps

 

Sunil

Re: Restrict an Absence Type to be created only during Ramadan Month

$
0
0

Thanks Jagan, appreciate your detailed input on this request.

 

Regards,

 

Kuppan Seenu

Issue in payroll regarding /565 wage type generation

$
0
0

Hi

I am facing a problem in payroll.  For one employee separation action was initiated wef 01.12.2015. While doing the separation action the HR user has delimited the infotype 0009 Bank details to 31.11.2015. Payroll has processed for Nov 2015. payroll user not identified the generation of wage type /565 and exited for the period Nov 2015. In the month of December Time administrator has made an entry for the period related to November 2015 in December 2015. Which was resulted the separated employee has selected for the payroll in December and net pay /560 and /566 is generated.  After identifying the issue of generating /560 and /566, HR user has deleted the entry in the infoype 2001 and changed the Infotype 0009 Bank details end date to 31.12.9999.  Processed the payroll. Still the problem not rectified. Again the Employee has selected to the payroll.for December.

 

Request to provide solution for the problem

 

Thanks & Regards

EKP YADAV

Pick Date on Delivery

$
0
0

Hi Every one,

i want Pick List Date on Delivery i made this query but it's not working can anyone correct this

 

select OPKL.PickDate

from opkl

inner join PKL1 ON PKL1.AbsEntry=OPKL.AbsEntry

where PKL1 .OrderEntry=$[DLN1 .BaseEntry] and PKL1 .OrderLine=$[DLN1 .BaseLine]

Re: GETWA_NOT_ASSIGNED Field symbol has not yet been assigned.

$
0
0

If that is all the code in your end routine, then it isn't going to work. What are you trying to achieve? Have you looked at examples of end routines that do work?

C_TFIN52_66 or C_TFIN22_66

$
0
0

Dear all ,


 

please advise me  which is more appropriate for experienced AP/AR controller using SAP ECC6.0 EHP7  for a certification exam appearance :

 

1- Appearing directly for C_TFIN22_66  certification exam

 

2- or starting with C_TFIN52_66 certification exam

 

 

 

thanks & regards

 

 

kareem


prep_input_check/readcvers_dump

$
0
0

Hi Gurus,

When trying to use SUM versionsp14for ehp6 to ehp7 upgrade we are facing issue  and please check the log READCVERSD.SAV attached

 

prep_input_check/readcvers_dump!

cat READCVERSD.SAV

 

#!--------------------------------------------------------------

#!---- MASKING file "READCVERSD.LOG" from "/usr/sap/trans/SUM/SUM/abap/log"

#!---- TIME: 20160101063452  PHASE: PREP_INPUT_CHECK/READCVERS_DUMP

#!--------------------------------------------------------------

 

1 ETQ201 Entering upgrade-phase "PREP_INPUT_CHECK/READCVERS_DUMP" ("20160101062637")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_ora_schema=SAPPR1

1 ETQ200 Executing actual phase 'PREP_INPUT_CHECK/READCVERS_DUMP'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'DUMP;DETPRODTYPE;INITCOMPINFO_START;INIT_AVERSTABLE'

2 ETQ399 Empty putsteps - configuring at least parallel batches and main import processes.

2 ETQ399 Distribute 6 parallel processes to 2 tp and 3 R3trans.

2 ETQ399 Requested task ID is 'READ_CVERS'.

3 ETQ399 Generated TQL file 'CVERSDUMP.TQL' with 2 SQL statements, log file 'CVERSDUMP.TMP'.

4 ETQ276 Executing SQL-script "CVERSDUMP.TQL"

3 ETQ120 20160101062637: PID 7929862 execute '/usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL', output written to '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT'.

3WETQ122 20160101062637: PID 7929862 exited with status 20 (time: 0.000/0.011/0.026 real/usr/sys)

1EETQ399 Last error code set is: Process /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool exited with 20, see '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT' for details

1EETQ204 Upgrade phase "READCVERS_DUMP" aborted with severe errors ("20160101062637")

 

#!--------------------------------------------------------------

#!---- MASKING file "READCVERSD.LOG" from "/usr/sap/trans/SUM/SUM/abap/log"

#!---- TIME: 20160101063512  PHASE: PREP_INPUT_CHECK/READCVERS_DUMP

#!--------------------------------------------------------------

 

1 ETQ201 Entering upgrade-phase "PREP_INPUT_CHECK/READCVERS_DUMP" ("20160101063452")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_ora_schema=SAPPR1

1 ETQ200 Executing actual phase 'PREP_INPUT_CHECK/READCVERS_DUMP'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'DUMP;DETPRODTYPE;INITCOMPINFO_START;INIT_AVERSTABLE'

2 ETQ399 Empty putsteps - configuring at least parallel batches and main import processes.

2 ETQ399 Distribute 6 parallel processes to 2 tp and 3 R3trans.

2 ETQ399 Requested task ID is 'READ_CVERS'.

3 ETQ399 Generated TQL file 'CVERSDUMP.TQL' with 2 SQL statements, log file 'CVERSDUMP.TMP'.

4 ETQ276 Executing SQL-script "CVERSDUMP.TQL"

3 ETQ120 20160101063453: PID 10879164 execute '/usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL', output written to '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT'.

3WETQ122 20160101063453: PID 10879164 exited with status 20 (time: 0.000/0.014/0.025 real/usr/sys)

1EETQ399 Last error code set is: Process /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool exited with 20, see '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT' for details

1EETQ204 Upgrade phase "READCVERS_DUMP" aborted with severe errors ("20160101063453")

 

#!--------------------------------------------------------------

#!---- MASKING file "READCVERSD.LOG" from "/usr/sap/trans/SUM/SUM/abap/log"

#!---- TIME: 20160101064320  PHASE: PREP_INPUT_CHECK/READCVERS_DUMP

#!--------------------------------------------------------------

 

1 ETQ201 Entering upgrade-phase "PREP_INPUT_CHECK/READCVERS_DUMP" ("20160101063512")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_ora_schema=SAPPR1

1 ETQ200 Executing actual phase 'PREP_INPUT_CHECK/READCVERS_DUMP'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'DUMP;DETPRODTYPE;INITCOMPINFO_START;INIT_AVERSTABLE'

2 ETQ399 Empty putsteps - configuring at least parallel batches and main import processes.

2 ETQ399 Distribute 6 parallel processes to 2 tp and 3 R3trans.

2 ETQ399 Requested task ID is 'READ_CVERS'.

3 ETQ399 Generated TQL file 'CVERSDUMP.TQL' with 2 SQL statements, log file 'CVERSDUMP.TMP'.

4 ETQ276 Executing SQL-script "CVERSDUMP.TQL"

3 ETQ120 20160101063513: PID 19595432 execute '/usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL', output written to '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT'.

3WETQ122 20160101063513: PID 19595432 exited with status 20 (time: 0.000/0.014/0.022 real/usr/sys)

1EETQ399 Last error code set is: Process /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool exited with 20, see '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT' for details

1EETQ204 Upgrade phase "READCVERS_DUMP" aborted with severe errors ("20160101063513")

 

#!--------------------------------------------------------------

#!---- MASKING file "READCVERSD.LOG" from "/usr/sap/trans/SUM/SUM/abap/log"

#!---- TIME: 20160101064330  PHASE: PREP_INPUT_CHECK/READCVERS_DUMP

#!--------------------------------------------------------------

 

1 ETQ201 Entering upgrade-phase "PREP_INPUT_CHECK/READCVERS_DUMP" ("20160101064320")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_ora_schema=SAPPR1

1 ETQ200 Executing actual phase 'PREP_INPUT_CHECK/READCVERS_DUMP'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'DUMP;DETPRODTYPE;INITCOMPINFO_START;INIT_AVERSTABLE'

2 ETQ399 Empty putsteps - configuring at least parallel batches and main import processes.

2 ETQ399 Distribute 6 parallel processes to 2 tp and 3 R3trans.

2 ETQ399 Requested task ID is 'READ_CVERS'.

3 ETQ399 Generated TQL file 'CVERSDUMP.TQL' with 2 SQL statements, log file 'CVERSDUMP.TMP'.

4 ETQ276 Executing SQL-script "CVERSDUMP.TQL"

3 ETQ120 20160101064320: PID 6226136 execute '/usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL', output written to '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT'.

3WETQ122 20160101064320: PID 6226136 exited with status 20 (time: 0.000/0.013/0.021 real/usr/sys)

1EETQ399 Last error code set is: Process /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool exited with 20, see '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT' for details

1EETQ204 Upgrade phase "READCVERS_DUMP" aborted with severe errors ("20160101064320")

 

#!--------------------------------------------------------------

#!---- MASKING file "READCVERSD.LOG" from "/usr/sap/trans/SUM/SUM/abap/log"

#!---- TIME: 20160101064337  PHASE: PREP_INPUT_CHECK/READCVERS_DUMP

#!--------------------------------------------------------------

 

1 ETQ201 Entering upgrade-phase "PREP_INPUT_CHECK/READCVERS_DUMP" ("20160101064330")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_ora_schema=SAPPR1

1 ETQ200 Executing actual phase 'PREP_INPUT_CHECK/READCVERS_DUMP'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'DUMP;DETPRODTYPE;INITCOMPINFO_START;INIT_AVERSTABLE'

2 ETQ399 Empty putsteps - configuring at least parallel batches and main import processes.

2 ETQ399 Distribute 6 parallel processes to 2 tp and 3 R3trans.

2 ETQ399 Requested task ID is 'READ_CVERS'.

3 ETQ399 Generated TQL file 'CVERSDUMP.TQL' with 2 SQL statements, log file 'CVERSDUMP.TMP'.

4 ETQ276 Executing SQL-script "CVERSDUMP.TQL"

3 ETQ120 20160101064330: PID 6226140 execute '/usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL', output written to '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT'.

3WETQ122 20160101064330: PID 6226140 exited with status 20 (time: 0.000/0.012/0.021 real/usr/sys)

1EETQ399 Last error code set is: Process /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool exited with 20, see '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT' for details

1EETQ204 Upgrade phase "READCVERS_DUMP" aborted with severe errors ("20160101064330")

 

#!--------------------------------------------------------------

#!---- MASKING file "READCVERSD.LOG" from "/usr/sap/trans/SUM/SUM/abap/log"

#!---- TIME: 20160101233135  PHASE: PREP_INPUT_CHECK/READCVERS_DUMP

#!--------------------------------------------------------------

 

1 ETQ201 Entering upgrade-phase "PREP_INPUT_CHECK/READCVERS_DUMP" ("20160101064337")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_ora_schema=SAPPR1

1 ETQ200 Executing actual phase 'PREP_INPUT_CHECK/READCVERS_DUMP'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'DUMP;DETPRODTYPE;INITCOMPINFO_START;INIT_AVERSTABLE'

2 ETQ399 Empty putsteps - configuring at least parallel batches and main import processes.

2 ETQ399 Distribute 6 parallel processes to 2 tp and 3 R3trans.

2 ETQ399 Requested task ID is 'READ_CVERS'.

3 ETQ399 Generated TQL file 'CVERSDUMP.TQL' with 2 SQL statements, log file 'CVERSDUMP.TMP'.

4 ETQ276 Executing SQL-script "CVERSDUMP.TQL"

3 ETQ120 20160101064338: PID 6226144 execute '/usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL', output written to '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT'.

3WETQ122 20160101064338: PID 6226144 exited with status 20 (time: 1.000/0.013/0.026 real/usr/sys)

1EETQ399 Last error code set is: Process /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool exited with 20, see '/usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT' for details

1EETQ204 Upgrade phase "READCVERS_DUMP" aborted with severe errors ("20160101064338")

sapecsb2:sb2adm 16> more /usr/sap/trans/SUM/SUM/abap/log/SQLSTMTSTD.OUT

    ENV: ORACLE_BASE=/oracle

    ENV: ORACLE_HOME=/oracle/SB2/112_64

    ENV: ORACLE_PSRV=SB2

    ENV: ORACLE_SID=SB2

    ENV: ORA_NLS33=/oracle/client/11x_64/ocommon/nls/admin/data

    ENV: PATH=/usr/sap/trans/SUM/SUM/abap/bin:/oracle/SB2/112_64/bin:/usr/bin:/etc:/usr/sbin:/usr/ucb:/home/sb2adm/bin:/usr/bin/X11:/sbin:.:/usr/sap/SB2/SYS/exe/uc/rs6000_64:/usr/sap/SB2/SYS/exe/run:/home/sb2adm

    ENV: SAPDATA_HOME=/oracle/SB2

    ENV: SAPSYSTEMNAME=SB2

    ENV: dbms_type=ORA

    ENV: dbs_ora_schema=SAPPR1

    ENV: dbs_ora_tnsname=SB2

    PWD: /usr/sap/trans/SUM/SUM/abap/tmp

 

EXECUTING /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL

Logging to '/usr/sap/trans/SUM/SUM/abap/log/CVERSDUMP.TMP'

 

FATAL ERROR: DBSL error 99 (db code -1): Connect failed

SAPup> Process with PID 6226140 terminated with status 20 at 20160101064330!

SAPup> Starting subprocess with PID 6226144 in phase 'READCVERS_DUMP' at 20160101064337

    ENV: DIR_LIBRARY=/usr/sap/trans/SUM/SUM/abap/bin

    ENV: LIBPATH=/usr/sap/trans/SUM/SUM/abap/bin:/usr/sap/trans/SUM/SUM/jvm/jre/lib/ppc64/server:/usr/sap/trans/SUM/SUM/jvm/jre/lib/ppc64:/usr/sap/trans/SUM/SUM/jvm/jre/lib/ppc64/jli:/usr/sap/trans/SUM/SUM/jvm/jre/../lib/ppc64:$LIBPATH:/usr/taxware390/utl:.:/opt/

IBM/ldap/V6.2/lib64/:/sapmnt/SB2/exe/uc/nwrfcsdk/lib/:/usr/sap/SB2/SYS/exe/uc/rs6000_64:/usr/sap/SB2/SYS/exe/run

    ENV: NLS_LANG=AMERICAN_AMERICA.WE8DEC

    ENV: ORACLE_BASE=/oracle

    ENV: ORACLE_HOME=/oracle/SB2/112_64

    ENV: ORACLE_PSRV=SB2

    ENV: ORACLE_SID=SB2

    ENV: ORA_NLS33=/oracle/client/11x_64/ocommon/nls/admin/data

    ENV: PATH=/usr/sap/trans/SUM/SUM/abap/bin:/oracle/SB2/112_64/bin:/usr/bin:/etc:/usr/sbin:/usr/ucb:/home/sb2adm/bin:/usr/bin/X11:/sbin:.:/usr/sap/SB2/SYS/exe/uc/rs6000_64:/usr/sap/SB2/SYS/exe/run:/home/sb2adm

    ENV: SAPDATA_HOME=/oracle/SB2

    ENV: SAPSYSTEMNAME=SB2

    ENV: dbms_type=ORA

    ENV: dbs_ora_schema=SAPPR1

    ENV: dbs_ora_tnsname=SB2

    PWD: /usr/sap/trans/SUM/SUM/abap/tmp

 

EXECUTING /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL

Logging to '/usr/sap/trans/SUM/SUM/abap/log/CVERSDUMP.TMP'

 

FATAL ERROR: DBSL error 99 (db code -1): Connect failed

SAPup> Process with PID 6226144 terminated with status 20 at 20160101064338!

SAPup> Starting subprocess with PID 22610088 in phase 'READCVERS_DUMP' at 20160101233135

    ENV: DIR_LIBRARY=/usr/sap/trans/SUM/SUM/abap/bin

    ENV: LIBPATH=/usr/sap/trans/SUM/SUM/abap/bin:/usr/sap/trans/SUM/SUM/jvm/jre/lib/ppc64/server:/usr/sap/trans/SUM/SUM/jvm/jre/lib/ppc64:/usr/sap/trans/SUM/SUM/jvm/jre/lib/ppc64/jli:/usr/sap/trans/SUM/SUM/jvm/jre/../lib/ppc64:$LIBPATH:/usr/taxware390/utl:.:/opt/

IBM/ldap/V6.2/lib64/:/sapmnt/SB2/exe/uc/nwrfcsdk/lib/:/usr/sap/SB2/SYS/exe/uc/rs6000_64:/usr/sap/SB2/SYS/exe/run

    ENV: NLS_LANG=AMERICAN_AMERICA.WE8DEC

    ENV: ORACLE_BASE=/oracle

    ENV: ORACLE_HOME=/oracle/SB2/112_64

    ENV: ORACLE_PSRV=SB2

    ENV: ORACLE_SID=SB2

    ENV: ORA_NLS33=/oracle/client/11x_64/ocommon/nls/admin/data

    ENV: PATH=/usr/sap/trans/SUM/SUM/abap/bin:/oracle/SB2/112_64/bin:/usr/bin:/etc:/usr/sbin:/usr/ucb:/home/sb2adm/bin:/usr/bin/X11:/sbin:.:/usr/sap/SB2/SYS/exe/uc/rs6000_64:/usr/sap/SB2/SYS/exe/run:/home/sb2adm

    ENV: SAPDATA_HOME=/oracle/SB2

    ENV: SAPSYSTEMNAME=SB2

    ENV: dbms_type=ORA

    ENV: dbs_ora_schema=SAPPR1

    ENV: dbs_ora_tnsname=SB2

    PWD: /usr/sap/trans/SUM/SUM/abap/tmp

 

EXECUTING /usr/sap/trans/SUM/SUM/abap/bin/SAPuptool execdb ../var/CVERSDUMP.TQL

Logging to '/usr/sap/trans/SUM/SUM/abap/log/CVERSDUMP.TMP'

 

FATAL ERROR: DBSL error 99 (db code -1): Connect failed

SAPup> Process with PID 22610088 terminated with status 20 at 20160101233135!

SQLSTMTSTD.OUT: END

Re: Inventory Transfer-GRPO Doc number need to display

$
0
0

Hi Kennedy T,

 

We  have set  our default ware house as QC/QAE and all GRPO receipt  in the QC/QQE ware house  after quality inspection  we transfer the stock to MS/MSE  ware house .I need query what are pending GRPO with QC for the given period( more than 2 days).

 

Can you help me in this regards

 

Regards

 

K.Raja

Re: bdc error

$
0
0

You should use conversion routine.

 

for example.

 

if you pass material code as 10.

 

use conversion routine "CONVERSION_EXIT_MATN1_INPUT"

 

material code will be 000000000000000010

 

 

same as you need to find conversion routine for required field.

 

 

-Avirat

How to process incidents which created in old number range

$
0
0

Hi,

 

We changed the new number range for the ZMIN transaction, but some incidents which are related to old number ranges are still in Process.

 

When I try to change the old incidents,its Status shows "Completed In Process Printed" and doesn't allow any change to incident.

 

Please suggest,how to fix this issue to process the old incidents.

 

Thanks in advance

Re: SQL error in fields occurred during a patch update - transport

$
0
0

Hi Rana,

 

Thx for the info...

According to the sap note  1248769 , when trying to reconstruct the table it is in disable/inactive status

Any idea?

SE14 -> BSEG table ...EDIT

Table -> Reconstruct (inactive)

 

rgds

zerandib

Moving reports and users from SAP BI 4.1 SP3 to SAP BI 4.1 SP6

$
0
0

Hi

 

I need to move reports(50 webi) and users(100 users, where some are Windows AD user) from BI 4.1 SP3 to the fresh installed BI 4.1 SP6 system.


Is this will be the best way to move reports and user -> upgrade management tool in 4.1 SP3 - Live to BIAR and by using promotion management in 4.1 SP6 to import the BIAR file?


I have gone through some documents but I haven't get a proper steps.

Can anyone guide me step by step process to move the users.

 

Thanks in advance.

 

Regards

Raja S

CFO Dashboard in SAP BW

$
0
0

Hello Experts,

 

My client need CFO Dashboard in SAP BW. So I will be going to design CFO Dashboard in SAP BW. In that regards I have some queries to know from you.

 

1. What is CFO Dashboard?

2. What is the approach?

3. What types of reports come in it?

4. Are there any standards are available in BW 3.5 & BI 7.0?

5. What are the area to be concentrated?

 

Please advise.

 

Thank you in advance.


Re: Unable to install Excel Addin after Office Upgrade

$
0
0

Hi,

 

The previous problem has been solved but I am still not able to install Add-in 4.0.2.1 and it is telling "Please use Office version 2003 or higher". I am using MS Office 2016.

 

Is Excel Add-in 4.0.2.3 compatible with MS Office 2016?

 

Regards,

Re: External Storage for HANA Appliance Scale-up

$
0
0

Hi Sunil Thank you for response, I know about TDI and certified Storage. My query is regarding connecting HANA Appliances (Scale-up) for external certified storage, is it allowed? I understand their are internal disks at appliances and doesn't require external connectivity, but in case is it allowed to connect appliance with external storage?

Re: NEED SPT to be blocked user wise

Portal NW730 select correct Schema SAPSIDDB DB2 LINUX

$
0
0

Dear All,

 

I need to export a Portal system NPQ. Which schema should I export

 

1 ) Which Schema is my Current portal system ( NPQ) using. When I execute the statement below, I get two answers, the two contender are ofcourse SAPNPPDB and SAPNPQDB. Surprisingly there are two schema - may be due to old system copy.

 

In the Config tool -> Secure store -> Connection Pool -> NPQ properties URL has Schema=SAPNPPDB and user = sapnppdb

So , I am confused to export SAPNPQDB or SAPNPPDB because SID is NPQ and in configtool connection is related to NPP.

 

 

*************

db2 => select schemaname from syscat.schemata

 

 

SCHEMANAME

--------------------------------------------------------------------------------------------------------------------------------

NULLID

NULLIDR1

NULLIDRA

SAPNPPDB

SAPNPQDB

SAPTOOLS

SQLJ

SYSCAT

SYSFUN

SYSIBM

SYSIBMADM

SYSIBMINTERNAL

SYSIBMTS

SYSPROC

SYSPUBLIC

SYSSTAT

SYSTOOLS

******************************************************************************************************

 

Please help me choose which schema should I choose in the export step DATABASE Schema .  SAPNPQDB or SAPNPPDB ?

 

Regards,

Re: IS Task Failing in CMC

$
0
0

Hi Mohan,

 

Yes Now i got it and now I am able to see..the logs.

But after viewing the logs I have some doubts.

as I told that 2 of my jobs are failing..and both are scheduled to run at 21 CET..among that one job ran on time..but failed with Utility failed with code 4. (COR-10020) this error in [E] column.

 

other job dint run on time and failed with

Error accessing repository objects: There is no subtask

Task process finished with errors. Status is set to failed. (TSK-10027)

[I] 2016-01-01 01:00:56.947 Utility processing ended.

[E] 2016-01-01 01:00:56.963 Utility failed with code 4. (COR-10020)

 