Hi,
I can see my simulation version in /sapapo/cdspss0, but then the active version scheduling are transferred to this simulation version.
Is that a standard SAP behavior that the active version things are getting transferred to simulation version.
In detail:
I saved my planning board as simulation version by giving a name say X1 and I can see that in /sapapo/cdpss0 . Then I again go to planning board in active version and do some planning there and save in active version. But then I can see the same changes while opening the simulation version X1 in /sapapo/cdpss0. Is this a standard behavior?
If then Is there a way to save the simulation schedule so that it doesn't get overwritten when I adopt the real schedule.
Thanks,
Prasanth