Hello Nagarajan, Could you please give me the contact information for SAP support? Thanks.
Re: Restore a deleted G/L Account
Re: (MX) Contabilidad Electrónica - RME 2014 Anexo 24
Re: Symbols in adobe forms
Hi Evgenij
Go to Library Palette and add image field and insert the required symbol.
Let me know it should work out.
Thanks,
Neha
Re: Payment term for Vendor payments.
Re: Payment term for Vendor payments.
Re: SOD RULESET ISSUE (GRC 10 SP 15 )
Re: SF Employee Central Associate Level Certification Exam preparation
Hi Elvetia,
The content is included with the Partner Edition.
BR, Regina
Re: FPM application was started without configuration
Thanks a ton Christian.
Re: Connection to Solution Manager
Hi Guilherme,
If PowerDesigner is unable to obtain the default context (package ID) for the Solution Manager server, theContext (package ID) field will be displayed. If you do not know the ID, click the field name to go to the Business Process Blueprinting page on your server, and then click the configuration file download link for the selected Solution Manager Related Package, open the text file, and copy the ID from it.
It is important to say that having the Business Process Blueprinting Tool installed on your Solution Manager before you try to create this connection between PD and SM.
Regards
Valdecir
Export Webdynpro ABAP table Data to 95 Workbook Excel format
Hi All,
I have a requirement were I need to download internal table data to excel file in 95 Excel Workbook format in Webdynpro.
Right now I can download and view the file in excel, but the file is stored as UTF-16 format, but I need this in 95 Excel workbook format.
I am using attach_file_to_response method with mime type 'EXCEL'.
Thanks
Rathish
Re: Add single operation to multiple routings
Thank you, that seems to be the solution.
Re: Replenishment upto Maximum Stock level
Maintenance Plan Call Horizon not Accurate after Package Change
The call horizon determines the call date based on the shortest duration package associated with the maintenance plan task list. We're noticing though, even after a package change to a longer-duration package, the call horizon continues to use the original, shorter-duration package in its call date calculation, even though the package has been replaced.
Is this normal behavior?
Re: Ssf Error Main width changed
This error comes generally when you have two pages with different main window sizes on page1 and page2.
Try to have same length for two main windows.
Re: How to have a fix schedule line date in the sales order
Hi Noel,
The requirement here is that stock will always be there so it is not required to calculate schedule line date based on availability check rules.. it should be 1 day+ requested delivery date for a particular ordertype say ZOR and a sales org jp01.
Kindly advise.
Thanks,
Praveen
Re: WF_PRIORITY doesn't changed dynamically in task
Hi Akshay,
First, check in the workflow log, from where the workitem is fetching the priority value and do the required changes.
Or else,
If you are sure to define the sub-workflow as low( 5) priority, in the sub workflow, first create a container step and assign the _WF_PRIORITY value = 5. Then check.
Best Regards,
Murali Krishna.
Re: Crystal Report authorization on SAP 9.1
why yes, that works. I wanna know if it's a bug for the DI on version 9.1. The same report is uploaded via AddOn on SAP B1 for HANA and SAP B1 v9.0 for SQL and there's no problem.
thanks
Re: YTD Measure is not calculating correctly in Standard RDS
Hi Vijay,
The values you see in a report will depend on the storage type of the model and the measure selected for the report. In a YTD storage type the value in each month is assumed to be cumulative. In your example if you have entered values 100, 200 and 300, for Jan, Feb and March, it is assumed that 200 in February is the sum of 100 in January and 100 in February. The same is true for March. Therefore when you query the values in a report, depending on measure the values will be different.
In a YTD model type with YTD measure you will see the same values you have entered. But with Periodic or QTD measure you will see different values from what you entered.
In your case, if your model has storage type YTD then based on the example and the screen prints you have attached the values for periodic are showing correctly.
Regrads,
Leila
Technical View on SAP SD
Hi Guys,
Could any one briefly tell what SD process from end-to-end in a technical point of view. Am facing lot of issue like how to adapt business process with code. I mean to say for example if someone asks to 'Post the goods', i was unable to put the code , technically what needs to be done for posting the goods ( like from which table i need to fetch and for which table i need to update.....etc.,).
Could you please tell me whole business process of SD in code point of view.
Regards,
Hemanth
Re: changing domain in table vbap
If you increase the length of the field, the data may be kept, but have you thought about all the reports (including standard SAP reports) that expect a data element of a certain length?
Rob